What to check before signing a commercial lease in Montréal

3 min read

Vacant street-level commercial unit with a glazed storefront and exposed ceiling

The location works, the rent fits your budget, and the landlord can hand over the keys in six weeks. Before signing, book a second walkthrough. Bring a list of the activities you plan to run and ask to see the building systems that serve the unit. Whether the space can support the work may matter as much as the rent.

Describe the actual use to the borough

Give the borough the full address, suite number and a plain description of what will happen in the space. A shop selling packaged goods and one preparing food on site can have different needs. An office becoming a clinic with several treatment rooms is another example.

Check the occupancy permit process and ask which work would require a renovation permit. Note what documents are needed, who can file them and when. If your schedule depends on approval, have the lease conditions reviewed before committing. City of Montréal occupancy permit process

Walk the space with the floor plan

Start at the sidewalk and follow the route a customer would take, then walk the delivery route. Note steps, thresholds, door widths and shared areas. Find the electrical panel, water connections and accessible ventilation equipment. A landlord’s plan is a starting point. Have the conditions that determine your layout checked on site.

  • Ask which systems serve your unit and which are shared with other tenants.
  • If the project requires a new exhaust route or a slab penetration, ask the landlord where that work might be possible.
  • Photograph visible conditions and mark any unconfirmed capacity or route as an open question.
Electrical service cabinet and conduit in a vacant commercial unit

Assign the work before asking for a price

Make a two-column list. On one side, write down what the landlord will hand over, in what condition and on what date. On the other, list what you need priced. An electrical panel that is already there and one that can supply your equipment are two different pieces of information. Ask who would pay for changes to common building systems if your project needs them.

Put the handover, approvals, construction and equipment installation on one schedule. If rent starts when you get the keys, count the weeks you might be paying for a unit that is still under construction.

Make a one-page brief for each address

Before choosing between two units, write down the intended use, the landlord’s scope, the three unknowns most likely to affect the budget, and your opening date. Bring the brief to your first walkthrough with a contractor. You can ask for each option to be priced on the same assumptions.

For the next step, read the office fit-out budgeting guide. Ozar also lists its commercial construction services in Montréal.